Our Case Studies
Real solar, battery, EV charger and heat pump installations we have completed for homes and businesses across Scotland.

Tesla Powerwall 3 Replacement in North Berwick: From Fault-Finding to Installation
After an urgent repair and a later Tesla-led replacement, Renew-Able Solutions coordinated and installed two new Powerwall 3 units for a North Berwick family.

Hypervolt EV Charger Installation in Colinton, Edinburgh
From solar PV installed in 2011 to battery storage and a Leapmotor B10: a white Hypervolt Home 3 Pro installation in Colinton, designed to keep EV charging from draining the home batteries.

EcoFlow PowerOcean Battery Installation in Ballachulish, near Glen Coe
A Highland installation combining a 5 kW EcoFlow PowerOcean 2 inverter, 10 kWh of battery storage and UPS backup, with expected savings of around £850 a year.

Eleven Energy Sodium-Ion Battery Installation in Milnathort, Fife
A Milnathort home now has 13.5 kWh of Eleven Energy Galvani sodium-ion battery storage, EPS backup and a low-cost overnight charging strategy.
Commercial Solar Maintenance Case Study: Testing, Thermal Imaging & Panel Care
An anonymised commercial solar maintenance case study covering electrical inspection, internal HIKMICRO thermography, drone surveys and proposed panel cleaning and biological-growth control.